Hello.
Has anyone considered making a Maximum Demand Controller, switch on/Off loads to minimize peak load of electricity?
Beckhoff has one in their building basic library, but that one needs a pulse counter. I was hoping to make one that used measurment data from a meter over mBus or modbus.
Any pointers in the right direction would surely help me alot.
-Tom
We are interested in the content you are currently talking about. But I want more information.